3. Board policy 442 - Jury Duty - Professional Employees - retire, second, final
reading.
B. Act26 MOU — Approved the Act 26 Memorandum of Understanding between Seneca
Valley School District and local law enforcement agencies.
---
Student Agreem…
Article
Board of Education (Seneca Valley)
2025-08-11
PUBLIC HEARING ON THE PROPOSED
Intermediate High School
Performing Arts Center
Addition
5:30 PM | September 8, 2025
Held at:
Seneca Valley Intermediate High
School Auditorium
126 Seneca School Rd Harmony,
PA 16037
---
10
11
12
13
14
Agenda…
Article
Board of Education (Seneca Valley)
2025-08-11
4. Present the estimated construction cost, the
total project cost, indirect costs and the
financial needs and estimate of the local tax
impact of the project.
5. Provide citizens and residents with an
opportunity to offer comments and written
testi…
Article
Board of Education (Seneca Valley)
2025-08-11
The proposed project offers
a long term solution to
support future student
growth, evolving academic
programs, and a better-
connected secondary
campus. The new layout
would also allow for
improved integration with
the adjacent Senior High
School and…
Article
Board of Education (Seneca Valley)
2025-08-11
The interior finishes throughout the
Intermediate High School are
significantly outdated and have
exceeded their intended lifespan.
While the staff has done a good job
maintaining the facility, the 63 year
old building no longer supports the
needs of…
Article
Board of Education (Seneca Valley)
2025-08-11
Option 3. Partial Building Renovation &
Additions with connection to Senior High
School (new Gym, Performing Arts,
Cafeteria, Library District Office)
Option 4. New Building on Same Location
Option 5. New 6-8 Building (offsite),
Convert RGMS to 9-1…
Article
Board of Education (Seneca Valley)
2025-08-11
Seneca Valley| Act 34 Public Hearing — Intermediate High School & Performing Arts Center Addition
functional and well-appeinted
spaces to remain in use with
selective upgrades and
renovations. These spaces
include, but are not limited to, the
IHS ca…
Article
Board of Education (Seneca Valley)
2025-08-11
Current Site Usage: Existing
Intermediate High Schootl site on SV
Secondary Campus
Topography: Moderate topography
on the site.
Wetlands: No wetlands within project
boundary,
Available Utilities: Electricity, Gas,
Water, Sewer, Telecom
Site Acces…
Article
Board of Education (Seneca Valley)
2025-08-11
Learning support spaces are
distributed on each floor and include
gifted and speech classrooms,
therapy and counseling suites and
faculty enclaves centrally located for
the convenience of teachers and
staff. Small group rooms, seminar
rooms and large…
Article
Board of Education (Seneca Valley)
2025-08-11
Dedicated theatrical lighting and audiovisual systems
will be provided in the performing arts center
theater.
Seneca Valley| Act 34 Public Hearing — Intermediate High School & Performing Arts Center Addition CannonDesign 13
---
Egress lighting wil…
Article
Board of Education (Seneca Valley)
2025-08-11
An underground conduit and manhole system will be
installed between the existing building and the
adjacent Senior High School to replace the
underground conduit system being disrupted/removed
during construction. This facilitates the routing and
exte…
Article
Board of Education (Seneca Valley)
2025-08-11
ACTIONS TOBE TAKEN IN THE FUTURE IF PROJECTIONS COME TRUE
ANU EHE SLHUUL BISERILY EAPEMHIENLED EALEDY UK INSUREILIENI LAFALIY
(FTE MINUS PROJECTED EMROLLMENT (Cob 1115 - ot
300}
CHECK IF APPLICABLE:
EXPAND PHOGRAMS OK COURSE OFFERINGE
PROVICDE S…
Article
Board of Education (Seneca Valley)
2025-08-11
Department Lagand
W ADMNISTRATION & STAFF
W CORE LEARNING
WS ELECTIVES
W SPECIAL ED & LEARNING SUPRORT
SHARED - LIBRARY | MEDIA
1 SHARED COLLABORATION | FORUM
W SHARED . PERFORMING ARTS
BN SHARED - DINING
W SHAAED - FITNESS
Seneca Valley] Ac…
Article
Board of Education (Seneca Valley)
2025-08-11
3. TOTAL - Movable Fixtures & Equipment
6,059,423
1,122 251
7.181.674
D. STRUCTURE COSTS, ARCHITECT'S FEE,
MOVABLE FIXTURES & EQUIPMENT -
TOTAL (A-9 plus B-3 and C-3)
129,102 941
21,584,595
150,687 536
E., SITE COSTS
1. Sanitary Scwage Dispo…
Article
Board of Education (Seneca Valley)
2025-08-11
1. TOTAL PROJECT COSTS (F plus G-9 plus H-10) 165,896,311
BOND ISSUL/NOTE BOND ISSUE/NOTE BOND ISSUE/NOTE
REVENUE SOURCES SERIES OF 2026 |SERIES oF SERIES OF TOTAL
J. AMOUNT FINANCED
FOR THIS PROJECT ONLY 156,010,000 156,010,000
K. ORIGINAL ISSUE DIS…
Article
Board of Education (Seneca Valley)
2025-08-11
4. Roof Replacement/Repair - Total 500,000
F. ARCHITECT*'S FEE ON ROOF REPLACEMENT/REPAIR 29,500
REVISED JULY t, 2010 FORM EXPI‘PES 6-30-12
Seneca Valley| Act 34 Public Hearing — Intermediate High School & Performing Arts Center Addition
PLANCON-D…
Article
Board of Education (Seneca Valley)
2025-08-11
4. Total Excludable Costs
(B-1 plus B-2 and B-3} $ 14,451,200
C.ACT 34 MAXIMUM BUILDING CONSTRUCTION COST
(A minus B-4} S 114651741
THE BOARD MUST ADOPT THE FIGURE % / T —
LINE C BEFORE SCHEDULING THE FIRST
ACT 34 HEARING.
ON ANY PLANNED WORK.
D…
Article
Board of Education (Seneca Valley)
2025-08-11
Review of the financing
projections prepared in
connection with this
Project, and discussions
with the School District's
Administration indicated
that financing the entire
project with cash is not
feasible. The School
District does not have the
unass…
Article
Board of Education (Seneca Valley)
2025-08-11
bonds. This would result in
higher annual debt service
payments for the School
District. The General
Obligation alternative offers
the School District the
advantage of lower interest
rates, more favorable
refunding provisions and
keeps more control w…
Article
Board of Education (Seneca Valley)
2025-08-11
1. The School District wiil not utilize bond insurance on the
2026 Bonds as the District is rated Aal and therefore
lowered their Costs of Issuance significantly.
2. The School District will utilize a "wrap around”
amortization to structure the new …
Article
Board of Education (Seneca Valley)
2025-08-11
9,618,096
17,397,323
18,734,775
18,735,825
18,732,625
18,939,325
18,934,800
18,933,800
18,935,700
18,933,500
18,931,050
18,931,250
18,933,250
18,931,000
18,933,250
18,933,250
18,934,500
18,930,250
18,934,000
18,933,500
17,682,000
384,903,068
Seneca…
Article
Board of Education (Seneca Valley)
2025-08-11
Seneca Valley| Act 34 Public Hearing — Intermediate High School & Performing Arts Center Addition CannonDesign 35
---
Seneca Valley| Act 34 Public Hearing — Intermediate High School & Performing Arts Center Addition CannonDesign 36
---
14 Public …
Article
Board of Education (Seneca Valley)
2025-08-11
The Seneca Valley School
Board, by resolution duly
adopted, has authorized a
maximum building
construction cost of
$114,651,741and a
maximum total project cost
of $165,896,3111n
connection with the
Project:
Seneca Valley| Act 34 Public Hearing — Int…
Article
Board of Education (Seneca Valley)
2025-08-11
Act 34 Resolution, Act 34 Hearing, and Act 34 Project Description Booklet –
Approve the Act 34 Resolution for the construction of the Intermediate High School
& Performing Arts Center Addition located at 126 Seneca School Road, Harmony,
Pennsylvania,…